+
  • 8708319b-5137-4d00-9744-fedfaf81ad3e.jpg

Machine arc welding workstation project

Category:


Product features

contact

product details



Production cycle: 360S/set
Number of welds: 80
Total length of weld: 6800mm

Harbin built (military) northern special vehicle project: end frame welding project, single robot upside down form, double station, one station for lifting single-axis positioner with robot welding work, the second station is equipped with three-axis flip position machine to cooperate with the robot's welding work, walking mechanism with flip robot for double station switching.



Harbin built (military) northern special vehicle project: end frame welding project

 

Online consultation


Copyright © 2023 Shenyang Weiding Robot Co., Ltd  Powered by 300.cn  shenyang.300.cn  SEO   license

Service

Hotline

024-86152964

888电子集团